[ Tile Installation ]
TILE IS PRECISION WORK. YOUR SCHEDULING SHOULD BE TOO.
Multi-day installations. Material that has to be on site before the crew arrives. GC timelines that shift without warning. Tile work demands precision in the layout and precision in the logistics — but most tile contractors still run on phone calls and handwritten schedules. OPS keeps your crews, your materials, and your GC coordination tight.
Get started for free · No credit card · No training required
[ THE PROBLEM ]
GC SCHEDULES THAT PUT YOUR CREW IN LIMBO.
- • As a subcontractor, you do not control the timeline. The GC says "tile crew starts Wednesday" — then moves it to Friday at 5 PM on Tuesday. Your crew is booked. Your material was delivered for Wednesday. Now everything shifts.
- • Multiple GC projects with overlapping timelines mean your crew is pulled between jobs. One GC pushes, another pulls, and your 3-person crew cannot be in two places at once.
- • Waiting on other trades — painters need to finish, plumbing rough-in needs inspection, floor prep is not done — means your tile crew shows up and cannot start. A wasted day of labor for a crew standing in an unready room.
- • Communication with GCs is fragmented. Updates come by text, email, phone call, and sometimes a sticky note on the site board. Missing one update means showing up on the wrong day.
For tile contractors and business owners
MATERIAL ON SITE IS THE JOB'S SINGLE POINT OF FAILURE.
- • You cannot lay tile that is not there. Special-order tile takes 2-6 weeks. If the material delivery does not align with the crew schedule, the crew sits idle and you eat the labor cost.
- • Material quantities require precise calculations from room measurements. Over-order and you waste money on returns or leftover boxes. Under-order and the production lot may have changed — meaning the new tile does not match.
- • Multiple jobs running simultaneously mean multiple material orders in transit. Material for the bathroom remodel delivered to the commercial lobby project wastes a day and a truck.
- • Grout, thin-set, backer board, waterproofing membrane, trim pieces — tile jobs have more material SKUs than most trades. If one item is missing, the job stalls.
For tile crew leaders and project coordinators
MULTI-DAY INSTALLS WITH NO VISIBLE PROGRESS TRACKING.
- • A bathroom tile job is 2-3 days. A commercial floor is 1-2 weeks. A custom shower is 4-5 days with waterproofing cure times built in. Nobody outside the crew knows what phase the job is in without calling the foreman.
- • Homeowners and GCs want progress updates. Your foreman is on their knees cutting tile and also fielding phone calls about "when will it be done?" That is not productive for anyone.
- • Photo documentation of progress — substrate preparation, waterproofing membrane application, layout, grouting — protects you when someone claims the work was not done to spec. But those photos are on personal phones.
- • Cure times between phases — waterproofing before tile, tile before grout, grout before sealing — mean your crew leaves and comes back. If nobody tracks which jobs need return visits and when, a job falls through the cracks.
For tile installers and field crews
[ THE SOLUTION ]
HOW OPS HANDLES IT
[ 01 ]
GC SHIFTS THE DATE. OPS SHIFTS THE CREW.
Wednesday becomes Friday. Drag the job, and your crew sees the new schedule on their phone. Material delivery updates. Downstream jobs adjust. No calling three people. No scrambling at 6 AM. The GC changed the plan — your operation absorbed it in one minute.
[ 02 ]
YOUR CREW KNOWS WHAT IS ON SITE BEFORE THEY ARRIVE.
Job details, material list, delivery status, room measurements, customer tile selections, and access instructions — on your crew's phone before they load the van. No showing up to a job missing the bullnose trim. No calling the office from the site asking which grout color the customer picked. The answer is on their screen.
[ 03 ]
PROGRESS VISIBLE. PHOTOS ATTACHED. PHASES TRACKED.
Substrate prep done. Waterproofing membrane curing. Layout started. First section grouted. OPS tracks which phase every job is in, and your crew captures progress photos attached to each phase. Homeowners and GCs get proof of progress without calling your foreman. Return visits for grout and sealing never get forgotten.
[ 04 ]
RESIDENTIAL. COMMERCIAL. CUSTOM. ONE SCHEDULE.
Bathroom remodels, commercial floors, custom showers, backsplash installs — every tile job in one schedule. Your office sees the pipeline. Your crew sees their day. What gets booked is what gets built, with the right material, at the right site, on the right date.
[ VS THE ALTERNATIVES ]
SEE HOW OPS COMPARES
| Feature | OPS | Jobber | Buildertrend |
|---|---|---|---|
| Pricing | Free to start, $79/mo flat | $49-$199/mo, feature-gated | $99-$499/mo |
| Sub-contractor scheduling | Flexible scheduling with GC coordination | Basic job scheduling | Full project management, complex |
| Offline mode | Full offline, syncs on reconnect | Limited offline | Requires connectivity |
| Photo documentation | Photos by phase, attached to jobs | Photo capture on paid plans | Photo management available |
| Crew app simplicity | Open and see your day, no training | Clean but feature-gated | Feature-heavy, GC-oriented |
| Time to start | Download and go, same day | Setup + plan selection | Onboarding + setup required |
[ FREQUENTLY ASKED ]
TILE IS PRECISION. YOUR SCHEDULING SHOULD MATCH.
GC-responsive scheduling. Material coordination. Phase tracking with photos. One app for every tile job. Free to start — no demo, no contract.